KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Tip-up QB build project
' style=
Date:  11-23-2011
Number of Hours:  12.50
Manual Reference:  
Brief Description:  Researchd and designed a final layout

Researched and laid out the final layout as decided. Spent the full day designing drawings for the cutters (CAD) and the concept drawings for our own reference and for preview. Also designed a new structure to secure the panel and house the various components which included moving the two supports outwards to clear the EFIS installations. Drew up these parts as well to be cut.

3 CAD technical drawings at 1:1 produced for the cutters and for technical reference, and two full color concept drawings at 1:1 including the chosen instruments and various fittings and finishing. The idea is that we can effect whatever changes we want to the drawing first to see how it works before miving stuff on the panel. Worked late due partly to circumstances but also wanted to finish all the drawing so I could continue other work tomorrow.
' style=

final layout preview drawing 1.1

final layout preview drawing 1.1

' style=

Cutter's CAD artwork drawn up

Cutter's CAD artwork drawn up

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.