KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Tip-up QB build project
' style=
Date:  2-18-2011
Number of Hours:  9.00
Manual Reference:  
Brief Description:  Steps installation (Right)

Cabin internal installation
' style=

view of the clearance afforded by the hole cut in the skin

view of the clearance afforded by the hole cut in the skin

' style=

Tube fixed inside the attachment block

Tube fixed inside the attachment block

' style=

Attachment block secured to the stiffner in the baggage area floor.

Attachment block secured to the stiffner in the baggage area floor.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.