Primed and then assembled the Vertical Stab. Had a problem with the pneumatic rivet puller that required disassembly. Team of three seems ideal when doing mass pop riveting. Fred stopped by in the aftyernnon to help and Aleta & Kevin came by after dinner.
Magnetic parts tray is the ulitmate mandrel collector