KitLog pro

Powered By Kitlog Pro v2.0

Team RV-12
' style=
Date:  7-30-2011
Number of Hours:  8.00
Manual Reference:  21
Brief Description:  Front bulkhead and prep

Tis was the replacement bulkhead, and this time it was completed without defects. From there the outboard floor panels were installed and finally the control column.

The control column was our first use of "washer wrench" very helpful
' style=

Dan Working on the front bulkhead

Dan Working on the front bulkhead

' style=

Installing platenuts on the floor panels

Installing platenuts on the floor panels

' style=

Control Rod installed

Control Rod installed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.