Powered By Kitlog Pro v2.0
Team RV-12
RV-12
All
7-30-2011
< Previous Log Entry
Next Log Entry >
Date:
7-30-2011
Number of Hours:
8.00
Manual Reference:
21
Brief Description:
Front bulkhead and prep
Tis was the replacement bulkhead, and this time it was completed without defects. From there the outboard floor panels were installed and finally the control column.
The control column was our first use of "washer wrench" very helpful
Dan Working on the front bulkhead
Installing platenuts on the floor panels
Control Rod installed
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
RV-12 Home
Category
# Logs
# Hours
All
87
769
Empennage
15
125
Fuselage
36
425
Miscellaneous
6
1
None
4
Wings
26
218
Copyright © 2001-2024 Matronics. All Rights Reserved.