KitLog pro

Powered By Kitlog Pro v2.0

Dans RV8
' style=
Date:  7-20-2006
Number of Hours:  2.00
Manual Reference:  Planning
Brief Description:  Planning

I spent the evening reviewing the big picture. The fuselage is about done. It is time to start installing electronics.



The big items left for the fuselage are:
  • Attaching Empennage
  • Attaching Wings
  • Installing Rudder Cables
  • Installing Wiring
  • Installing brake and fuel tubing
  • ' style=










    Copyright © 2001-2024 Matronics. All Rights Reserved.