KitLog pro

Powered By Kitlog Pro v2.0

Dans RV8
' style=
Date:  6-14-2006
Number of Hours:  3.00
Manual Reference:  Floors
Brief Description:  Match Drilling Floors

I clecoed up the parts and match drilled. Then I put the floor assemblies into the fuselage. This required removal of the rear baggage floor, which was temporarily pop riveted in place for shipping. I then match drilled the floor skins to the fuselage.



The rear floors are designed to be pop-riveted in place. We decided to go with plate nuts to allow removal for upgrades in the future. This will require a slight modification to the floor to all them to fit in with the stiffeners attached. We are notching out the floor to get around the bulkheads. This will leave a small gap in the floor. We will put a plate over the gap.
' style=

Floors drilled and clecoed

Floors drilled and clecoed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.