KitLog pro

Powered By Kitlog Pro v2.0

Dans RV8
< Previous Log Entry          Next Log Entry >
' style=
Date:  4-6-2007
Number of Hours:  0.13
Manual Reference:  
Brief Description:  Busy Building Engine Data Monitors

Progress on the airplane came to a halt for over 6 months!

I took on a consulting contract with JPI to build the Vision Micro VM1000C. This was interesting but was a major time-sink for the airplane. I have passed on doing a next-generation product for them. (I am proud of the new VM1000C).

With luck, we are back in the airplane building business.....
' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.