I worked on the cabin heater control box placement.
Finished attaching the box and applying fire seal to the gaps. I had to re-route the engine control cables slightly to route the SCAT ducts by making a new connection between the lower two control cables.
Meanwhile, Cameron worked on locating and installing the cabin heat Bowden cable. The process went smoothly.
We installed more Adel clamps, a seemingly never-ending job.