KitLog pro

Powered By Kitlog Pro v2.0

Dans RV8
' style=
Date:  11-7-2016
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Baffle Floor Assemblies

I continued working on the baffle floors. The right floor is complete. It has been riveted to the side baffle.

The left floor is ready to rivet to the left front side baffle. I test fit the air filter as shown. The snorkel fit is very good. It is ready to drill the attachment holes to the injector box.
' style=

Front Right Floor Complete

Front Right Floor Complete

' style=

Left Floor Complete

Left Floor Complete

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.