I spent the afternoon assembling the two floor brackets, finishing the right baffle floor.
The left baffle floor is more complex. I got the various support brackets riveted. Fitting the air filter holder took a lot of fitting. Van's has changed the snorkel alighnment procedures. Not a big deal if I had fit mine correctly. I hadn't. It turned out that I had to rotate the snorkel about 5 degrees counterclockwise to elevated it and move it inboard at the floor. This required first elongating the four mounting holes which attach the snorkel to the fuel injector.
I got a good fit and trimmed the snorkel. I then filled the existing holes with flox and resin. I will drill new holes using the new procedure for the RV14