KitLog pro

Powered By Kitlog Pro v2.0

Dans RV8
' style=
Date:  11-2-2016
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Control Hookup

I got up the courage to drill holes in the landing gear box. It would be nearly impossible to repair a mistake - whether it is violating a clearance distance or cutting through the already installed wire bundles or fuel lines.

I found guidance on an obsucre inset showing the engine control levers and a position on the aft side of the landing gear. I verified that there was plenty of clearance and drilled and deburred holes. No problems.

I measured the various cables. The ideal lengths seem to be
- Prop Control 67"
- Throttle 53"
- Mixture 60"

I had to order the 53", but have the others.
' style=

Penetrating Landing Gear Box

Penetrating Landing Gear Box

' style=

Fitting Control Levers

Fitting Control Levers

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.