KitLog pro

Powered By Kitlog Pro v2.0

Dans RV8
' style=
Date:  11-10-2011
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Rebuild Avionics Mounting Panel

I rebuilt the avionics mounting bulkhead to incorporate the new CNC cut panel.

The first step was to drill out all of the old rivets. I dreaded this, but it went quite quickly.

Next was the usual match drilling, deburring and countersinking.

Rivetting went pretty quickly. I did have to drill out about 10 rivets to get a smooth fit.

The notches for the longerons had to be opened up from about 0.110 to 0.140" The result was a very, very tight, precise fit.

I finsihed by ScotchBriting and priming the back side.

I need to do the same thing to the main panel, then send them all out for powder coating.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.