KitLog pro

Powered By Kitlog Pro v2.0

Dans RV8
' style=
Date:  11-5-2011
Number of Hours:  8.00
Manual Reference:  
Brief Description:  Avionics Wiriing - Continued

I completed wiring of the power to the systems. I hooked up all digital signals, such as PTT.

I had a couple of set-backs. I had broken a couple of Jack Screws on the FastStack system. I disassembled one DB connector (molded) trying to replace the jack screw. I will need to get a new hood for that connector.

I found suitable replaement receptacles for the jack screws and replaced them.

I have to add connectors to the headset cables After that, it is time to start wiring the ship-side of the connectors
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.