KitLog pro

Powered By Kitlog Pro v2.0

Dans RV8
' style=
Date:  9-16-2011
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Wiring the Main Switch Panel

I hooked up the far end switches today.

I am waiting for a DP3T switches to wire the Alternator. To simplify the design and provide Over Voltage Protection redundancy, I am setting up a double pole. Switch 1, will control Alternator Field voltage. Position 1 will be OFF, Position 2 (middle) will route the field to the Backup Alternatore. Position 3 (normal on position) will drive the Primary Alternator. This will assure that if the primary alternator fails, I can switch to Alt 2. And if it goes over voltage, I can switch it off (P1), then go to the middle position to energize the Backup Alt.
' style=

Most Switches Finalized

Most Switches Finalized

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.