Powered By Kitlog Pro v2.0
Davids Web Site
RV-9a
Empennage
7-23-2009
< Previous Log Entry
Next Log Entry >
Date:
7-23-2009
Number of Hours:
1.00
Manual Reference:
Brief Description:
Left Elevator Spar Prep
Riveted the hinge reinforcement plates and nutplates to the spar. Riveted the inboard rib to the spar. Clecoed the spar assembly to the skin and clecoed the Elevator horn bracket to the spar assembly so it can be match-drilled and then riveted.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-9a Home
Category
# Logs
# Hours
All
92
171
Empennage
88
168
Miscellaneous
3
3
Tools
1
Copyright © 2001-2024 Matronics. All Rights Reserved.