KitLog pro

Powered By Kitlog Pro v2.0

STANLEY'S WEB SITE
' style=
Date:  2-11-2011
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Fuel Lines

Decided on dual gasolators located at the lowest point, behind the main gear channel. Started the installation one the right side. Put the gasolator through the bottom gusset. Plan to run 3/8 in. Alum. tubing from the gasolator, through bulkheads, under the seat pan, through the Seat channel to the AndAir fuel selector in the center console.

Also work on the layout for the new instrument panel. Will need to make several changes as a result of the electrical circuits.
' style=

Left Side

Left Side

' style=

Bulkhead - Left Side

Bulkhead - Left Side

' style=

New Instrument Panel

New Instrument Panel

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.