Installed pitot and ran tubing behind the rear channel in the trailing edge. Secured tubing to pitot tube with wire clamps and used zip ties to secure the tubing to entry to fuselage. Added āLā channel bracket to O/B spar near tip. Clecoed top skin to the wing.