Fabricated flange around fuel filler for better fit on the fuel skin. Installed wires for Nav. lights in previously installed conduit. Reinstalled nose skin and riveted all put the spar holes. Had to reposition the wing, again my wife was kind enough to help. Put top skin in place and clecoed in preparation for riveting.