Drilled 1/8 in. hole in HS steel hinges used to attached the elevator. This allows it to be secured by a carter pin. Made the upper and lower cable brackets and updrilled, then riveted to HS.
Tail nearly complete. Need to install bushing for center hinge and it will be here by next week.