KitLog pro

Powered By Kitlog Pro v2.0

STANLEY'S WEB SITE
' style=
Date:  7-12-2011
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Cooling Ducts

The epoxy ran as it harden and now it will needs to be redone. Removed the duct tube and the epoxy and re-epoxy the outside of the cooling tube to the RamAir duct on the right side. This time, I braced the cooling tube for drying.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.