Powered By Kitlog Pro v2.0
STANLEY'S WEB SITE
CH-750
All
10-22-2010
< Previous Log Entry
Next Log Entry >
Date:
10-22-2010
Number of Hours:
2.50
Manual Reference:
Brief Description:
Engine heads
Picked up the two engine heads from the machine shop in Grottes, VA. Reamed the valve inserts and checked the valve seat. Will need to do some reaming of the valve seats to get a really good seat.
Fitted the front and rear spars on the right wing.
Top of head
Bottom of head
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
CH-750 Home
Category
# Logs
# Hours
All
445
1298
Assembly
113
328
Avionics
27
76
Controls
3
11
Empennage
21
56
Empennage - HS
21
56
Empennage - VS
5
12
Engine
31
105
Firewall Forward
6
16
Forward Fuelage
21
67
Fuel System
1
2
Fuselage
34
95
Hortizonal Stabilize
4
11
Miscellaneous
18
56
None
2
1
Rear Fuelage
23
90
Service Bulletin
2
7
Wing - Left
6
16
Wing - Right
40
114
Wing Slats
9
22
Wings
40
114
Wings
6
18
Wings Flaperons
12
25
Copyright © 2001-2024 Matronics. All Rights Reserved.