Drilled1/4 in. drain hole in nose gear leg and wheel fork and safety wired the wheel axle bolts to wheel fork.
Refitted the arm rest support so the arm rest would fit correctly. Needed to remove torque rod to do this. However, it looks like need to fit everything, and rivet arm rest sides after nearly every thing is completed below the seat supports.
Fitted and cut elevator push rod, drilled hole and slotted push rod for connection to torque rod. Deburred, cleaned and primed push rod.