Powered By Kitlog Pro v2.0
CHUCK'S WEB SITE
Sonex-B Tri-Gear
All
4-6-2024
< Previous Log Entry
Next Log Entry >
Date:
4-6-2024
Number of Hours:
3.10
Manual Reference:
Sonex Jabiru XN
Brief Description:
Completed Both Tunnel Installations.
Cut and dressed edges of pilot side exhaust tunnel opening.
Finshed initial positioning and clecoing of both exhaust tunnels.
Completed all updrilling from #40 to #30 hole size.
Deburred/dressed and remaining edges and all drilled holes.
Rivetted both tunnels into final position to complete the tunnel installations.
Updrilling from #40 to #30 for final rivetting.
Rivetting the tunnel into final position.
Installation of both exhaust tunnels completed.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Sonex-B Tri-Gear Home
Category
# Logs
# Hours
All
463
1153
Avionics
53
142
Controls
20
62
Cowling
66
140
Documentation
69
81
Electrical System
4
17
Empennage
56
163
Engine
43
98
Fuel System
8
17
Fuselage
79
232
Landing Gear
28
97
Miscellaneous
8
12
Plans Review
7
14
Tools
3
10
Wings
19
68
Copyright © 2001-2024 Matronics. All Rights Reserved.