KitLog pro

Powered By Kitlog Pro v2.0

CHUCK'S WEB SITE
' style=
Date:  1-2-2024
Number of Hours:  1.00
Manual Reference:  SNB-P13
Brief Description:  Installing Cowling Side Vents

The side vent openings were cut out approximately 1/8" inside of the inner tape line area on the inside of the cowling. Vents were then aligned on the openings to center the vents on the slightly smaller openings, then clecoed in place. This provides a slight bit of overhang from the side openings that will need to be sanded/removed to match the vent openings.
' style=

Aligned and then temporarily clecoed the vents in place.

Aligned and then temporarily clecoed the vents in place.

' style=

Vent opening was cut out just inside of the inside tape line markings.

Vent opening was cut out just inside of the inside tape line markings.

' style=

Both side openings cut and vents temporarily clecoed in proper place per the specs.

Both side openings cut and vents temporarily clecoed in proper place per the specs.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.