Installed all nutplates on the MFD tray, rivvetted the two sides to the bottom piece, then attached the avionics components.
Re-installed both the PFD and the MFD trays onto the instrument panel, then re-attached the PFD and MFD displays.
Attached one hose straight swivel hose fitting to a short piece of steel braided fuel line to go from the fuel shutoff valve to the cabin side of the bulkhead fitting. This keeps the line from the fuel tank to the bulkhead fitting at least a little flexible in the event of a hard landing. The second fitting is arriving tomorrow.
MFD tray being rivetted together after the nutplates were installed.
MFD tray components installed.
PFD and MFD avionics trays with installed components re-installed onto the intrument panel.