Powered By Kitlog Pro v2.0
CHUCK'S WEB SITE
Sonex-B Tri-Gear
All
6-22-2023
< Previous Log Entry
Next Log Entry >
Date:
6-22-2023
Number of Hours:
1.80
Manual Reference:
Brief Description:
Final Mounting Of The ADAHRS Unit
Completed the final mounting of the ADAHRS unit.
Replaced all regular harware initially used with brass harware per requirements for the internal magnetometer.
Drilled and installed bolts for the two arced slots to provide the roll adjustability to the mount.
Preliminarily set a coarse adjustment of 0 degrees for the ADAHRS. More accurate adjustment will be set once the inuts are connected.
Replaced all mounting hardware with brass hardware, and added the two arced mounting bolts.
Side view of final mounting position and adjustability.
Final mounting position on second cross member support looking aft into the tailcone.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Sonex-B Tri-Gear Home
Category
# Logs
# Hours
All
463
1153
Avionics
53
142
Controls
20
62
Cowling
66
140
Documentation
69
81
Electrical System
4
17
Empennage
56
163
Engine
43
98
Fuel System
8
17
Fuselage
79
232
Landing Gear
28
97
Miscellaneous
8
12
Plans Review
7
14
Tools
3
10
Wings
19
68
Copyright © 2001-2024 Matronics. All Rights Reserved.