KitLog pro

Powered By Kitlog Pro v2.0

CHUCK'S WEB SITE
' style=
Date:  6-10-2023
Number of Hours:  1.75
Manual Reference:  
Brief Description:  Test Fitting Initial Avionics Trays

Attached the intiial prototype aviaonics trays for test fitting and initial trial layout of components. Checking the position and fit of the ACM on the vertical tray side that will attach to the underneath side of the glare shield.

Also trying to determine where the various components will mount, how the cables from the ACM will run, and how much room there is in the PFD tray after most of the ACM cables are attached and protruding out from the ACM, filling the tray space.
' style=

ACM attached to vertical PFD tray side.  This will need an ever so slight adjustment up for the final.

ACM attached to vertical PFD tray side. This will need an ever so slight adjustment up for the final.

' style=

Tray space before cables start filling up on the ACM.

Tray space before cables start filling up on the ACM.

' style=

Most ACM cables attached and protruding into the available space of the PFD tray.

Most ACM cables attached and protruding into the available space of the PFD tray.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.