KitLog pro

Powered By Kitlog Pro v2.0

CHUCK'S WEB SITE
' style=
Date:  3-11-2023
Number of Hours:  6.60
Manual Reference:  
Brief Description:  Installing Firewall Power Components

Very long and slow work to get the primary firewall components mounted. I ended up pulling the fuel tank to provide the neccessary room to work under the glare shield for interior cabin side firewall work.

I started with actual-size paper mock-ups of the voltage regulator and fan assembly, the Vertical Power PPS, the dual-sided firewall "field of grounds", and two firewall penetration kits mounted in the desired positions. After marking and drilling/ fitting the mounting holes for each component, my wife worked on one side of the firewall and I worked the other to mount the components securely.

Ready to start cutting, labeling and terminating the basic power wiring to these major components.
' style=

Paper mock-ups installed to verify amd mark positions.

Paper mock-ups installed to verify amd mark positions.

' style=

The primary firewall components mounted and ready for wiring.

The primary firewall components mounted and ready for wiring.

' style=

One of the firewall penetration kits and the cabin-side

One of the firewall penetration kits and the cabin-side "field of grounds".

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.