Brief Description: Installing Firewall Power Components
Very long and slow work to get the primary firewall components mounted. I ended up pulling the fuel tank to provide the neccessary room to work under the glare shield for interior cabin side firewall work.
I started with actual-size paper mock-ups of the voltage regulator and fan assembly, the Vertical Power PPS, the dual-sided firewall "field of grounds", and two firewall penetration kits mounted in the desired positions. After marking and drilling/ fitting the mounting holes for each component, my wife worked on one side of the firewall and I worked the other to mount the components securely.
Ready to start cutting, labeling and terminating the basic power wiring to these major components.
Paper mock-ups installed to verify amd mark positions.
The primary firewall components mounted and ready for wiring.
One of the firewall penetration kits and the cabin-side "field of grounds".