KitLog pro

Powered By Kitlog Pro v2.0

CHUCK'S WEB SITE
' style=
Date:  12-22-2022
Number of Hours:  0.70
Manual Reference:  SNB-G01
Brief Description:  Prepping AeroInjector For Installation

Started prepping the AeroInjector by drilling out the mixture cable holder to fit a 1/4" mixture cable housing.

Then marked the mixture arm positions for idle-cutoff and a 90 degree rotation to full-rich.
' style=

Mixture cable holder drilled out to receive a 1/4

Mixture cable holder drilled out to receive a 1/4" mixture cable housing.

' style=

Mixture arm at idle-cutoff position.

Mixture arm at idle-cutoff position.

' style=

Full-rich position identified and marked at 90 degrees from idle-cutoff.

Full-rich position identified and marked at 90 degrees from idle-cutoff.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.