KitLog pro

Powered By Kitlog Pro v2.0

CHUCK'S WEB SITE
' style=
Date:  12-11-2022
Number of Hours:  1.40
Manual Reference:  SNB-P10
Brief Description:  Finalizing The Oil Cooler Instalation

Dissassembled the oil cooler system to re-install permanently.

Applied teflon paste to all required joints to seal and re-installed the oil cooler system, tightening all paste sealed NPT joints, as well as all tightening all AN connections to a tight seal.

Tightened all mounting bolts to secure and finish the oil cooler system installation.
' style=

Teflon thread paste applied to both oil cooler hose fittings and installed, then hoses tightened on.

Teflon thread paste applied to both oil cooler hose fittings and installed, then hoses tightened on.

' style=

Oil cooler and baffle assembly installed under the engine.

Oil cooler and baffle assembly installed under the engine.

' style=

Teflon thread sealant applied to oil cooler adapter nipples and installed.  Hoses attached/tightened.

Teflon thread sealant applied to oil cooler adapter nipples and installed. Hoses attached/tightened.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.