Powered By Kitlog Pro v2.0
CHUCK'S WEB SITE
Sonex-B Tri-Gear
All
11-28-2022
< Previous Log Entry
Next Log Entry >
Date:
11-28-2022
Number of Hours:
1.20
Manual Reference:
SNB-P14
Brief Description:
Drilling & Dimpling Battery Box Retaining Strap
Pilot drilled #40 holes, updrilled to 1/8" holes, then dimpled the holes for flush riveting on the battery box retaining strap.
Repeated this process for the retaining hinge that mounts to the top front edge of the battery box that the retaining strap attaches to.
Initial #40 pilot hole placement and drilling on the retaining strap.
Battery box retaining strap drilled and dimpled, reay for flush rivets.
Battery box retaining strap front hinge drilled and dimpled, ready for flush rivets.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Sonex-B Tri-Gear Home
Category
# Logs
# Hours
All
463
1153
Avionics
53
142
Controls
20
62
Cowling
66
140
Documentation
69
81
Electrical System
4
17
Empennage
56
163
Engine
43
98
Fuel System
8
17
Fuselage
79
232
Landing Gear
28
97
Miscellaneous
8
12
Plans Review
7
14
Tools
3
10
Wings
19
68
Copyright © 2001-2024 Matronics. All Rights Reserved.