KitLog pro

Powered By Kitlog Pro v2.0

CHUCK'S WEB SITE
' style=
Date:  11-18-2022
Number of Hours:  1.80
Manual Reference:  SNB-F18 & SNB-C06
Brief Description:  Riveting Cross Tie Box Closeout & Flap Brackets

Disconnected and removed the 6" nose trim linear actuator. Will replace with a 4" travel actuator.

Updrilled all #40 pilot holes in SNB-F24-11 cross tie box closeout and SNB-F18-04L/R flap actuator mounting brackets to #30 rivet holes.

Dissassembled cross tie box closeout and both flap actuator mounting brackets and deburred all parts.
' style=

Cross tie box closeout pilot cleoed in position.

Cross tie box closeout pilot cleoed in position.

' style=

Updrilling from #40 pilot holes to #30 rivet holes and copper clecoing into position.

Updrilling from #40 pilot holes to #30 rivet holes and copper clecoing into position.

' style=

Deburring Cross tie box closeout and flap actuator mounting brackets.

Deburring Cross tie box closeout and flap actuator mounting brackets.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.