Powered By Kitlog Pro v2.0
CHUCK'S WEB SITE
Sonex-B Tri-Gear
All
10-2-2022
< Previous Log Entry
Next Log Entry >
Date:
10-2-2022
Number of Hours:
7.00
Manual Reference:
SNB-W05
Brief Description:
Building Left Flap
Started the left flap. Layed out all marking lines for trimming and drilling holes.
Cut trim lines and control linkage notch on bottom side of inboard end.
Marked, set and drilled all #40 pilot holes in parts.
Drilled and mounted hinge with #40 pilot holes.
Updrilled all #40 pilot holes to #30 rivet holes.
Dissassembles, deburred, and reassembled entire flap assembly with copper clecos for final riveting.
Cleaned all parts with acetone to remove surface labelling/printing.
#40 pilots marked, drilled, and being clecoed into position.
Fitting the hinge onto the flap, setting the proper hinge lug spacing with my hlug spacing tool.
All deburred and reassembled, ready to be riveted.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Sonex-B Tri-Gear Home
Category
# Logs
# Hours
All
463
1153
Avionics
53
142
Controls
20
62
Cowling
66
140
Documentation
69
81
Electrical System
4
17
Empennage
56
163
Engine
43
98
Fuel System
8
17
Fuselage
79
232
Landing Gear
28
97
Miscellaneous
8
12
Plans Review
7
14
Tools
3
10
Wings
19
68
Copyright © 2001-2024 Matronics. All Rights Reserved.