Powered By Kitlog Pro v2.0
CHUCK'S WEB SITE
Sonex-B Tri-Gear
All
10-1-2022
< Previous Log Entry
Next Log Entry >
Date:
10-1-2022
Number of Hours:
6.10
Manual Reference:
SNB-W06
Brief Description:
Flap Skin Final Trimming And Drilling
Drew blue centerlines on flanges of the ribs for hole alignment.
Cut two SNB-W05-02 hinge halves.
Drilled #40 holes in the right flap on both long sides.
Cut notch in slanted end for control linkage clearance.
Completed drilling all #40 pilot holes except for hinge.
Started setting and drilling #40 pilot holes in hinge. Got two-thirds of the hinge drilled and silver cleacoed.
Rib pilot holes and control linkage cut-away on inboard end of left flap.
Ribs pilot drilled and silver clecoed in position.
Flap hinge 2/3 pilot drilled and silver clecoed in position.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Sonex-B Tri-Gear Home
Category
# Logs
# Hours
All
463
1153
Avionics
53
142
Controls
20
62
Cowling
66
140
Documentation
69
81
Electrical System
4
17
Empennage
56
163
Engine
43
98
Fuel System
8
17
Fuselage
79
232
Landing Gear
28
97
Miscellaneous
8
12
Plans Review
7
14
Tools
3
10
Wings
19
68
Copyright © 2001-2024 Matronics. All Rights Reserved.