Brief Description: Hinge Halves And Flap Drive Rib Assemblies
Made SNB-W06-06R/L hinge halves.
Made SNB-W06-05R/L drive rib assemblies. Dressed the edges of SNB-W06-04 flap drive plates. Layed out drill lines to position flap drive plates on ribs. Drilled #40 pilot holes and silver clecoed in position. Updrilled to #30 final size holes. Countersunk all holes for flush rivets. Dissassembled, deburred and reassembled with copper clecoes. Riveted with CCC-44 flush rivets. Completed both SNB-W06-05R/L.
Ruler template being used to drill piano hinges.
#40 pilot holes drilled and cleacoed for drive rib assemblies.
Drive rib assembly pilots updrilled to #30 and holes being bevelled for flush rivets.