KitLog pro

Powered By Kitlog Pro v2.0

CHUCK'S WEB SITE
' style=
Date:  5-8-2022
Number of Hours:  6.60
Manual Reference:  SNB-L06
Brief Description:  Main Landing Gear Fairings.

Spent first 1.6 hours evaluating plans for leg fairings and tracing them to create vectors for input to CAD/CAM package for CNC cutting of the leg fairing skins for SNB-L06-07L&R.

Studied plans and began work on wheel fairings. Marked cut sides, then taped off area for main axle cuts. Measured 11" from front of fairing, and 2 1/2" up from bottom edge of wheel opening. Made vertical opening for main axle. Clamped left fairing in place to check niitial positioning.
' style=

Locating initial point 11

Locating initial point 11" from fairing front, 2 1/2" upp from wheel opening.

' style=

Initial axle clearance cut.

Initial axle clearance cut.

' style=

temporarily clamped in place to check initial fit.

temporarily clamped in place to check initial fit.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.