KitLog pro

Powered By Kitlog Pro v2.0

CHUCK'S WEB SITE
' style=
Date:  3-14-2022
Number of Hours:  2.95
Manual Reference:  SNB-L04 & SNB-F05
Brief Description:  Right Side Main Gear Mount.

Kerry at Sonex Tech Support verified countersinkingonly for flush rivets and bolts was the new approved method of flush mounting rivets and bolts inside the spar tunnel. This is the current production method, even though the plans indicate to dimple.

Worked on mounting SNB-L04-02R right main landing gear weldment. All bolt and rivet holes drilled. All countersinking completed where required (bolts going through the spar tunnel). All rivets up-drilled. All deburring completed. Brakcet was mounted with all bolts, and cleacoed at rivet holes, ready for final riveting once more CCP-46 rivets are received.
' style=

Right main gear weldment in position.

Right main gear weldment in position.

' style=

Right side main gear weldment spar tunnel interior flush mounts.

Right side main gear weldment spar tunnel interior flush mounts.

' style=

Right side SNB-L04-02R weldment ready for final rivets when CCP-46 rivets come in.

Right side SNB-L04-02R weldment ready for final rivets when CCP-46 rivets come in.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.