KitLog pro

Powered By Kitlog Pro v2.0

CHUCK'S WEB SITE
' style=
Date:  3-6-2022
Number of Hours:  4.60
Manual Reference:  SNB-L04 / SNB-F05
Brief Description:  Mounting Right Main Gear Mount.

Drilled out the three rivest placed by mistake on the right side by the mount tab that gets bolted (they will be screws).

Worked to fit the right main gear mount in position. Clamped it to hold it, and checked the specified gear leg angles of 68 degrees from the side, and 38 degrees from the front. Angles look good, so I bolted the three outboard bolts through the mount and the lower longeron and skin.

Drilled the six pilot holes through the bottom mount flange based on pilot holes in the lower skin. Due to placement of the mount, the holes came through a little too close to the edge. They would probably be fine, but I will reinforce them with 5 additional rivets, staggered between the original six. This can be done on both side for symmetry.
' style=

Opening up the initial hole to the full size for the right landing gear mount and leg.

Opening up the initial hole to the full size for the right landing gear mount and leg.

' style=

Right main gear mount partially bolted and clecoed in place.

Right main gear mount partially bolted and clecoed in place.

' style=

38 degree main gear leg angle from front view was good, as was the 68 degree angle from the side.

38 degree main gear leg angle from front view was good, as was the 68 degree angle from the side.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.