Powered By Kitlog Pro v2.0
CHUCK'S WEB SITE
Sonex-B Tri-Gear
All
2-12-2022
< Previous Log Entry
Next Log Entry >
Date:
2-12-2022
Number of Hours:
0.80
Manual Reference:
SNB-F21 & SNB-T01
Brief Description:
Final Riveting Of The Tail Assembly.
Updrilled, deburred and final riveted the right side of the aft fuselage to the vertical stabilizer lower main spar.
Final riveted the left side of the aft fuselage to the vertical stabilizer lower main spar, with the lower rudder hinge in place as well.
Tail section now permanently attached.
Final riveting of the right side of the aft fuselage to the vertical stabilizer lower main spar.
Left side of the aft fuselage riveted to the vertical stabilizer lower main spar with hinge.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Sonex-B Tri-Gear Home
Category
# Logs
# Hours
All
463
1153
Avionics
53
142
Controls
20
62
Cowling
66
140
Documentation
69
81
Electrical System
4
17
Empennage
56
163
Engine
43
98
Fuel System
8
17
Fuselage
79
232
Landing Gear
28
97
Miscellaneous
8
12
Plans Review
7
14
Tools
3
10
Wings
19
68
Copyright © 2001-2024 Matronics. All Rights Reserved.