KitLog pro

Powered By Kitlog Pro v2.0

CHUCK'S WEB SITE
' style=
Date:  1-23-2022
Number of Hours:  0.70
Manual Reference:  
Brief Description:  Final Fitting Of VS After Bolting Down The HS.

Continuing with mounting the vertical stabilizer. Required some final fitting adjustments now that the HS has been bolted into place vs just being clamped and slightly moving as the VS is added.

Each iteration of removing the VS required unbolting the HS to remove the VS. Very time consuming to remove and re-install the bolts, particularly the aft two HS mounting bolts.

Determinied the skin on the nose of the VS needs a very slight amount removed to allow a little more lowering of the nose to straighten the spar at the back spine joint of the VS and the rear edge of the fuselage.

Also need to remove a little more of the turtle deck aft edge skin to provide ~1mm of clearence from the HS forward spar where it fits into the two notched areas to be bolted.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.