T02: Assembled horizontal stabilizer frame together (Main Spar, Forward Spar and all ribs) with #40 silver pilot clecos. Up-drilled all #40 pilot holes to #30 final size rivet holes. Dissassembled, deburred, dressed edges, cleaned and re-assembbled horizontal stabilizer frame with copper clecos for final rivetting. Rivetted horizontal stabilizer frame. Horizontal Stabilizer Assembly frame completed. Ready to skin the horizontal stabilizer.
Horizontal Stabilizer frame pilot clecoed together.
Rivetting the left side inboard spar 1 to the main spar assembly mounting bracket.