Brief Description: T02: Elevator Final Assembly. Elevator Complete.
T02: Finished final riveting of right elevator control surface half with CCP-41 rivets.
Dissassembled left elevator control surface half to clean and debur. Re-clecoed with copper clecoes, then final rivetted with CCP-42 rivets for hinge half, and CCP-41 rivets for center and outer ribs.
Drilled #40 pilot holes for both control surface root edges to drive horn root ribs.
Updrilled all holes to #30 on both control surface halves inner root ribs. Cleaned, deburred, and re-clecoed with copper clecos. Final rivetted with CCP-41 rivets to attach both elevator control surfaces with the elevator drive horn at the root ribs.
Outer-edge to outer-edge length verified to be 78".
Elevator complete.
Rinal rivetting on right elevator control surface.
Joining the two elevator control surface halves at the central drive horn root ribs.
Elevator final rivetting almost complete. Outer-edge to outer-edge length is 78".