KitLog pro

Powered By Kitlog Pro v2.0

CHUCK'S WEB SITE
' style=
Date:  10-12-2021
Number of Hours:  5.65
Manual Reference:  
Brief Description:  T02: Elevator Final Assembly. Elevator Complete.

T02: Finished final riveting of right elevator control surface half with CCP-41 rivets.

Dissassembled left elevator control surface half to clean and debur. Re-clecoed with copper clecoes, then final rivetted with CCP-42 rivets for hinge half, and CCP-41 rivets for center and outer ribs.

Drilled #40 pilot holes for both control surface root edges to drive horn root ribs.

Updrilled all holes to #30 on both control surface halves inner root ribs. Cleaned, deburred, and re-clecoed with copper clecos. Final rivetted with CCP-41 rivets to attach both elevator control surfaces with the elevator drive horn at the root ribs.

Outer-edge to outer-edge length verified to be 78".

Elevator complete.
' style=

Rinal rivetting on right elevator control surface.

Rinal rivetting on right elevator control surface.

' style=

Joining the two elevator control surface halves at the central drive horn root ribs.

Joining the two elevator control surface halves at the central drive horn root ribs.

' style=

Elevator final rivetting almost complete.  Outer-edge to outer-edge length is 78

Elevator final rivetting almost complete. Outer-edge to outer-edge length is 78".

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.