T02: Updrilled left and right elevator control surface halves.
Dissassembled, cleaned and deburred right elevator control surface half. Re-clecoed and final rivetted hinge half line with CCP-42 rivets. Waiting to hear back from Sonex Tech Support on wether to use CCP-41 or CCP-42 rivets for areas where only the skin and rib flange are joined (plans call for CCP-41 in one callout, and CCP-42 in another callout).
Updrilled and final size clecoed left elevator control surface half.
Right elevator hinge half final rivetted with CCP-42 rivets.