KitLog pro

Powered By Kitlog Pro v2.0

CHUCK'S WEB SITE
' style=
Date:  10-11-2021
Number of Hours:  4.20
Manual Reference:  
Brief Description:  T02: Elevator Control Surfaces

T02: Updrilled left and right elevator control surface halves.

Dissassembled, cleaned and deburred right elevator control surface half. Re-clecoed and final rivetted hinge half line with CCP-42 rivets. Waiting to hear back from Sonex Tech Support on wether to use CCP-41 or CCP-42 rivets for areas where only the skin and rib flange are joined (plans call for CCP-41 in one callout, and CCP-42 in another callout).

Updrilled and final size clecoed left elevator control surface half.
' style=

Right elevator hinge half final rivetted with CCP-42 rivets.

Right elevator hinge half final rivetted with CCP-42 rivets.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.