Powered By Kitlog Pro v2.0
CHUCK'S WEB SITE
Sonex-B Tri-Gear
All
10-9-2021
< Previous Log Entry
Next Log Entry >
Date:
10-9-2021
Number of Hours:
5.25
Manual Reference:
Brief Description:
T07 & T02: Making the two elevator control surface
Layed out all center and outboard holes for the elevator control surface halves.
Drilled pilot holes in the control surfaces center and outboard positions, then marked center lines on the flanges of the center elevator ribs.
Drilled pilot holes on the iner and outboard elevator ribs for both elevator halves.
Clecoed pilot-holed elevator hinge half, and center and outboard ribs on the right elevator half.
Plans page T07 complete.
Drilling initial #40 pilot holes in elevator halves.
Quick and easy way to evenly and consistently mark a rib flange centerline.
Pilot holes clecoed for one complete elevator half.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Sonex-B Tri-Gear Home
Category
# Logs
# Hours
All
463
1153
Avionics
53
142
Controls
20
62
Cowling
66
140
Documentation
69
81
Electrical System
4
17
Empennage
56
163
Engine
43
98
Fuel System
8
17
Fuselage
79
232
Landing Gear
28
97
Miscellaneous
8
12
Plans Review
7
14
Tools
3
10
Wings
19
68
Copyright © 2001-2024 Matronics. All Rights Reserved.