KitLog pro

Powered By Kitlog Pro v2.0

CHUCK'S WEB SITE
' style=
Date:  10-3-2021
Number of Hours:  2.70
Manual Reference:  
Brief Description:  T08: Assemble Vert Stabilizer Assy - Complete

T08: Deburred, cleaned and re-clecoed the vertical stabilizer assembly for final assembly and rivetting. Re-assembled and clecoed, Completed all final rivetting, except for holes specified in plans to be left at pilot hole size until fiberglass tail tip is installed.

Vertial Stabilizer Assembly complete.

Plans page T08 complete.
' style=

Pulling rivets to secure the skin to the Vertical Stabilzer frame.

Pulling rivets to secure the skin to the Vertical Stabilzer frame.

' style=

Completed Vertical Stabilizer Assembly.

Completed Vertical Stabilizer Assembly.

' style=

Completed Vertical Stabilizer Assembly.

Completed Vertical Stabilizer Assembly.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.