Brief Description: T08: Assemble Vert Stabilizer Assy - Complete
T08: Deburred, cleaned and re-clecoed the vertical stabilizer assembly for final assembly and rivetting. Re-assembled and clecoed, Completed all final rivetting, except for holes specified in plans to be left at pilot hole size until fiberglass tail tip is installed.
Vertial Stabilizer Assembly complete.
Plans page T08 complete.
Pulling rivets to secure the skin to the Vertical Stabilzer frame.