KitLog pro

Powered By Kitlog Pro v2.0

Chris' Web Site
' style=
Date:  6-27-2020
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Oil Cooler Mount

Plans:
1. Mount the oil cooler.
Status: Not much progress today. I cut the two cables to length and mated the straight 10AN fittings. It appears that neither the straight or 90 degree 10AN fitting produce a comfortable routing of the cables under the oil pan. I have ordered two 45 degree fittings to remake the cables. The upper brackets were finished and installed.

2. Apply cement to the wing leading edge.
Status: Complete. I finished coating the right upper wing's felt with contact cement. I am using green tinted 3M Fastbond from Amazon. The color appears identical to the Stewart Systems cement.
' style=

Right Oil Cooler 10AN Connection

Right Oil Cooler 10AN Connection

' style=

Left Oil Cooler 10AN Connection

Left Oil Cooler 10AN Connection

' style=

Coated Felt Overlayment

Coated Felt Overlayment

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.