KitLog pro

Powered By Kitlog Pro v2.0

Chris' Web Site
' style=
Date:  11-10-2018
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Storage Bin

Plans:
1. Continue storage bin fab and install.
Status: About 50% done. It doesn't look much different from previously but the separate parts were assembled. I added plate nuts to the top flanges for attaching the lid. I also riveted the bottom to the airframe and drilled holes for tying the walls down. From the front it's still a bit flimsy so I will add a frame around it next. I also have a small cargo-net to use as a keeper to prevent the contents from spilling out/forward.

Note: At the moment there is a discussion online about the D7 fuel tank. Apparently Sam's developed a hairline crack and is weeping fuel. I will need to pressure test my tank to see if it has any leaks.
' style=

Installing Plate Nuts for Top

Installing Plate Nuts for Top

' style=

Installing Bin Bottom

Installing Bin Bottom

' style=

Bin Cleco'ed in Place

Bin Cleco'ed in Place

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.