Plans: 1. Fab and install storage bin. Status: A decent start. The bottom and sides are cut and formed. I will be adding a removable top next. In the event I need to service the seat belts, having a removable top will provide easy access. The surface below the bin in is an equipment tray. At some point I may choose to add additional electronics. The lower tray provides plenty of extra space if needed.